Every LT panel schedule comes down to the same few checks for each feeder. Skip one, and a cable that looks fine on paper overheats in a crowded tray, or cannot survive the fault level at the panel. Use this checklist for every outgoing feeder, from the main LT panel to sub-distribution boards.

This is a design aid, not a substitute for your project specification, the applicable Indian Standards and manufacturers' data. Have every design checked by a qualified electrical engineer.

1. Start from the fault level at the panel

You need it for both the breakers and the cables, so work it out first. For a transformer fed from a strong grid, a quick estimate at the transformer terminals is:

Full-load current, IFL = kVA × 1000 ÷ (√3 × 415)
Fault current ≈ IFL × 100 ÷ %Z

For a 500 kVA transformer with 4.5% impedance: IFL ≈ 696 A, so the fault level is about 15.5 kA. Upstream impedance and the busduct or cable to the panel reduce this slightly; a detailed calculation should include them.

2. Work out the design current of each feeder

Three-phase: Ib = P ÷ (√3 × 415 × pf × η)
Single-phase: Ib = P ÷ (230 × pf × η)

P is in watts, pf is the power factor and η the efficiency (use 1 for non-motor loads). Apply the demand or diversity factor you have agreed for the load, and keep single-phase loads balanced across R, Y and B.

3. Choose the breaker

4. Size the cable for current, after derating

Take the base current rating from the cable maker's or standard tables for the cable type and laying method, then multiply by the correction factors for site conditions:

The derated rating Iz must be at least the breaker rating: Ib ≤ In ≤ Iz. Grouping is the factor most often forgotten. Six touching circuits on one tray can cut the rating by roughly a quarter or more.

5. Check the voltage drop

Three-phase VD% = √3 × Ib × L × (R cos φ + X sin φ) × 100 ÷ 415

R and X are the cable's resistance and reactance in ohms per km at operating temperature, and L is the route length in km. Add the drop on the incoming link and on upstream panels: the limit applies from the source to the load. Use the limits in your project specification. Many Indian projects allow about 3% on a feeder and about 5% from the transformer to the farthest load. Long single-phase runs, such as a guard room or street lighting, are usually where the voltage drop decides the size.

6. Check short-circuit withstand

The cable must survive the fault until the breaker clears it. The adiabatic check is:

Smin = √(I²t) ÷ k

Small cables close to a high-fault panel often fail this check even when they pass on current and voltage drop.

7. Size the earth conductor

A common table method (from IEC 60364-5-54) for a protective conductor of the same material as the phase conductor of size S:

Phase conductor S (mm²)Protective conductor (mm²)
S ≤ 16S
16 < S ≤ 3516
S > 35S ÷ 2

Your earthing scheme and specification may ask for more, for example two earth conductors for three-phase feeders.

8. Don't forget the neutral and motors

9. Record the governing check

For each feeder, note which check decided the size: current, voltage drop or short circuit. It makes design reviews faster and tells you what to look at first when a load or a length changes.

The checklist

Want these checks done for you? EDAS by AECVeda takes your load list and sizes every breaker and cable against current, voltage drop and short circuit. It also works out the fault level, draws the single-line diagram and builds the panel BOM, all exported to Excel. Free during early access: sign up, then install EDAS from the Apps page.